ITIL 4

ITIL 4 as a toolkit, not a rulebook

ITIL (originally the IT Infrastructure Library) is a widely used body of guidance for running IT services. I use it to make the networks and platforms I design supportable from day one. This page explains the service value system, the value chain and the 34 practices. It goes deeper on events, configuration, release and knowledge, shows how I measure and improve, and covers what ITIL Version 5 changes.

  • Value system
  • Guiding principles
  • Four dimensions
  • Value chain
  • 34 practices
  • CMDB
  • Events
  • Continual improvement
  • Version 5
Demand and opportunity becoming value A request for a new site and an opportunity to move to the cloud enter the service value system. Inside it, the guiding principles, governance, the value chain and the practices work together, and value leaves on the right as outcomes for the customer. A loop of continual improvement circles the whole system. continual improvement Demanda new site Opportunitya cloud move Value system Principles Governance Value chain 34 practices Valueoutcomes Demand in, value out, always improving
Live view · demand in, value out, improving as it goes
Value system

From demand to value, as one system

ITIL 4 stopped describing service management as a lifecycle of processes. It describes a service value system instead: everything an organisation uses to turn demand into value. I find this the most useful idea in the framework, because it makes support part of the design, not something added at the end.

The ITIL 4 service value system Opportunity and demand enter the service value system on the left. Inside it sit the guiding principles, governance, the service value chain with its six activities (engage, plan, improve, design and transition, obtain or build, deliver and support), the 34 management practices and continual improvement. A request flows through engage, design, obtain or build and deliver, and leaves on the right as value. Improvement feeds back into planning. Service value system Service value chain in in out Opportunitya better way Demanda need to meet Valueoutcomes Guiding principles Governance Engage Plan Improve Designand transition Obtainor build Deliverand support 34 management practices Continual improvement After the ITIL 4 service value system. Principles and governance steer; the chain and the practices do the work.

Swipe sideways to see the whole diagram.

One system, not a list of processes. Demand and opportunity come in. The value chain turns them into value, using the practices. The principles shape every decision and governance keeps it accountable. Continual improvement runs through all of it, so the system gets better each time it is used.

Animation

The words that matter

TermWhat it meansA network example
ServiceA way of creating value with a customer, by making outcomes possible without the customer managing the costs and risks.A branch connection: the branch gets working links without owning carriers or routers.
ProductThe resources an organisation configures to offer services: people, tools, suppliers and processes.Routers, a carrier contract, a monitoring tool and a support team.
Service offeringOne or more services, packaged for a type of customer: goods, access to resources and service actions.Gold branch connectivity: two circuits, a router, monitoring and a four hour fix.
Output and outcomeAn output is something produced. An outcome is the result the customer cares about.Output: a router configured. Outcome: the shop takes card payments.
UtilityFit for purpose: what the service does.Connects the branch to the data centre and the internet.
WarrantyFit for use: how well it does it, in availability, capacity, security and continuity.99.9% availability, enough bandwidth at peak, and encrypted links.
ValueThe benefit, usefulness and importance of something, as the people who use it judge it.Staff serve customers without waiting for the system.

Definitions paraphrased from ITIL 4. The examples are mine.

Opportunity and demand

Opportunity is a chance to add value, such as moving a data centre service to the cloud. Demand is a need for a service, such as a new office. Both enter the system the same way.

Governance

The board or leadership sets direction and checks the system is working. For infrastructure, that is the design authority, the change authority and the service reviews.

Practices

Sets of resources for a type of work: people, information, tools, suppliers and processes. Version 4 has 34 of them, and so does Version 5.

ITIL (originally the IT Infrastructure Library) is guidance, not a standard. ISO/IEC 20000 is the standard an organisation can certify its service management against, and ITIL is one way to meet it.

Projects hand new services into these practices. How I run them before that is on my PRINCE2 (Projects in Controlled Environments) page. In telecoms, the process view is eTOM (enhanced Telecom Operations Map), on my TM Forum page.

Principles

Seven guiding principles, applied to infrastructure

The guiding principles are the advice that holds whatever the situation. They are short and easy to quote, which makes them easy to ignore. These are the seven, each with the way I apply it to network and platform work.

  1. Focus on value. Everything should link back to value for someone. A change freeze that protects a trading floor is value. A form nobody reads is not, so I remove it.
  2. Start where you are. Measure what exists before replacing it. The old monitoring tool often has years of good thresholds that a new tool should inherit.
  3. Progress iteratively with feedback. Improve one site, one practice or one queue at a time, and check each step worked before the next. A big bang rollout of a new tool rarely survives first contact.
  4. Collaborate and promote visibility. Put work and its status where everyone can see it: one change calendar, one major incident timeline, one backlog of known errors.
  5. Think and work holistically. A network change touches security, servers, suppliers and the service desk. I review it with all of them, not just the network team.
  6. Keep it simple and practical. If a step adds no value, drop it. A standard change for a VLAN (virtual local area network) on an access port needs a template and a check, not a meeting.
  7. Optimise and automate. First make the work simple, then automate it. Automating a broken process only produces broken results faster.

They apply together

The principles are not a checklist to pick from. A good decision usually satisfies several at once, and a bad one breaks more than one.

They outlast the version

The same seven principles carry over into ITIL Version 5. They are the part of ITIL I use most outside service management, in design reviews and project planning.

They settle arguments

When two teams disagree about a process, asking "where is the value, and is this the simplest way?" ends most debates quickly.

Four dimensions

Four dimensions, so nothing is left out

ITIL 4 says every service and every practice must be looked at from four dimensions, inside a frame of external factors. It sounds abstract. In practice it is the best checklist I know for a service handover. Choose a dimension to see it applied to a new SD-WAN (software defined wide area network) service.

The four dimensions of service management A new SD-WAN service sits in the middle, surrounded by the four dimensions of service management: organisations and people, information and technology, partners and suppliers, and value streams and processes. External factors frame them all. Each button highlights one dimension and shows what it means for the service. External factors A new SD-WAN servicethe service in view Organisations and peopleskills, roles, culture Information and technologydata, tools, platforms Partners and supplierscarriers, vendors Value streams and processeshow work flows Who runs it, with which skills, and who decides Which data, tools and platforms it depends on Which suppliers carry part of the promise How the work flows, from request to support Law, cost, society and technology from outside Miss one dimension and the service has a gap

Swipe sideways to see the whole diagram.

Organisations and people. For a new SD-WAN service, the network operations centre needs training on the controller, the service desk needs a script for branch outages, and someone must own the policy. Culture counts too: a team that fears change will route everything to the CAB (change advisory board).

Information and technology. The controller, the monitoring feeds, the CMDB (configuration management database) records for every edge device, and the knowledge articles. It also covers what information the service needs and creates, and how that data is protected.

Partners and suppliers. The carriers for each underlay, the vendor for software and hardware support, and any managed service partner. Their contracts must support the promise made to the business, or the promise is hollow.

Value streams and processes. How a new branch is ordered and connected, how an outage is detected and fixed, and how a policy change reaches every site. Each is a value stream, built from value chain activities and practices.

External factors. ITIL uses PESTLE (political, economic, social, technological, legal and environmental factors). For SD-WAN that means regulation on where traffic may go, carrier prices, home working, new vendor features, contract law and the power drawn by every edge device.

All four together. I use the dimensions as a design checklist. When a service fails in its first months, the gap is usually in a dimension nobody owned: a supplier contract, a missing skill or an undocumented handoff, rarely the technology itself.

Animation
DimensionWhat I check before a service goes liveTypical gap
Organisations and peopleNamed service owner, trained support teams, on call rota, escalation contactsThe project team leaves and nobody else knows the design
Information and technologyCMDB records, monitoring, dashboards, knowledge articles, data classificationDevices live but not in monitoring or the CMDB
Partners and suppliersSupport contracts, fix times, escalation routes, licence renewalsA carrier fix time longer than the promise to the business
Value streams and processesRequest, incident, change and release routes, with the right assignment groupsTickets for the new service land in a generic queue
Value chain

Six activities, many value streams

The service value chain has six activities. They are not a sequence: each kind of work, from a password reset to a data centre migration, combines them in its own order. That combination is a value stream. Step through a branch office request to see one.

One value stream through the service value chain The six value chain activities, with a branch office request moving through them as one value stream. The customer engages, plan checks the roadmap, design and transition follows the standard pattern, obtain or build orders and stages the kit, deliver and support takes it live, value returns to the customer, and improve feeds lessons back. value reaches the customer Planroadmap, standards, budget Customerand users Engage Designand transition Obtainor build Deliverand support Improveevery activity, all the time service desk relationships change testing deployment configuration monitoring knowledge architecture, portfolio, risk measurement, problem Engage: understand the need Plan: check it fits the roadmap Design and transition: the standard pattern Obtain or build: order, stage, record Deliver and support: live, watched, supported The customer gets the outcome Improve: the next one is faster

Swipe sideways to see the whole diagram.

Step 1
  1. A regional manager asks for a new branch office connection. The service desk logs a request, and relationship management agrees the scope, the opening date and who signs off. Engagement keeps going until the branch is live.

  2. The request is checked against the network roadmap, the standards and the budget: which branch pattern, which carriers, which security controls. Planning sets direction for every value stream, not just this one.

  3. The design follows the standard branch pattern, so it is quick. The change is assessed and scheduled, and service validation and testing defines how the build will be proved.

  4. Circuits and hardware are ordered, the router is staged from a template, and the new configuration items go into the CMDB with their relationships.

  5. Go live. Monitoring watches the new links, the service desk has a knowledge article for the branch, and incidents route to the right resolver group from day one.

  6. The branch trades on its opening day. Value is created with the customer, not handed over: the branch gave the address, the access and the opening date, and confirms the outcome.

  7. Lead time, cost and incidents in the first month go into the improvement register. If carrier lead times caused the delay, the next branch orders circuits earlier. Improvement touches every activity.

ActivityIts purposeFor infrastructure it means
PlanA shared understanding of the vision, the current state and the direction for all products and services.Roadmaps, standards, lifecycle and capacity plans, budgets
ImproveContinual improvement of products, services and practices across every activity.The improvement register, problem trends, service reviews
EngageUnderstanding stakeholder needs, being transparent and keeping good relationships.The service desk, request intake, supplier and business relationships
Design and transitionMaking sure services meet expectations for quality, cost and time to market.High and low level designs, change, testing, release planning
Obtain or buildMaking service components available when and where they are needed, to specification.Ordering, staging, building from templates, recording assets and CIs (configuration items)
Deliver and supportMaking sure services are delivered and supported to agreed specifications and expectations.Operations, monitoring, incident and request fulfilment

Purposes paraphrased from ITIL 4. ITIL Version 5 adds a product and service lifecycle on top of these ideas; the practices stay the same.

Try it: build a value stream

A value stream is the route one kind of work takes through the value chain. Each uses the same six activities in its own order, with its own practices. Choose a piece of work to see its route. Without scripts, the firewall rule example is shown.

  1. EngageAn application team asks for access from a new server to a database.Service request management, service desk
  2. Design and transitionSecurity checks the rule against policy, the risk is scored and it is scheduled as a standard or normal change.Information security management, change enablement
  3. Obtain or buildThe rule is written from a template, peer reviewed and added to the rule base with an owner and an expiry date.Deployment management, service configuration management
  4. Deliver and supportThe requester tests the connection. Hit counts show it is used.Service request management, monitoring and event management
  5. ImproveRules with no hits after 90 days go to a quarterly review and are removed.Continual improvement, risk management
34 practices

The 34 practices, and which ones a network needs

ITIL 4 groups its practices into 14 general management, 17 service management and 3 technical management practices. Search or filter the list to see what each one is for, and how it shows up in infrastructure work.

Find a practice

Showing all 34 practices.

PracticeGroupIts purposeIn infrastructure work
Architecture managementGeneralUnderstands how the parts of the organisation fit, now and in future.Reference architectures, standards and the design authority
Continual improvementGeneralKeeps services and practices in line with changing needs.The improvement register and its owners
Information security managementGeneralProtects the information the organisation needs.Firewall policy, access control, vulnerability response
Knowledge managementGeneralKeeps knowledge usable, so people can find and trust it.Runbooks, known errors and diagrams people actually use
Measurement and reportingGeneralSupports decisions with data that reduces uncertainty.Availability, capacity and incident trends per service
Organisational change managementGeneralManages the human side of change so it sticks.Training and support when a new tool or process arrives
Portfolio managementGeneralKeeps the right mix of programmes, projects, products and services within budget.Which refreshes and migrations get funded this year
Project managementGeneralDelivers projects through planning, control and coordination.Refreshes, migrations and builds, often run with PRINCE2
Relationship managementGeneralBuilds and keeps links with stakeholders.Service reviews with business units and suppliers
Risk managementGeneralUnderstands and handles risk.The risk register, change risk and end of life exposure
Service financial managementGeneralSupports decisions on spending and investment in services.Cost per site, licence costs and recharges
Strategy managementGeneralSets goals and the actions and resources to reach them.The infrastructure strategy and its roadmap
Supplier managementGeneralMakes sure suppliers and their performance support the services.Carrier and vendor contracts, fix times and reviews
Workforce and talent managementGeneralPuts people with the right skills in the right roles.Skills matrices, training plans and on call cover
Availability managementServiceMakes sure services deliver the availability that was agreed.Redundancy design and availability reporting
Business analysisServiceAnalyses the business, defines its needs and recommends solutions.Requirements for a new site, service or migration
Capacity and performance managementServiceMeets agreed performance and future demand at a sensible cost.Link, firewall and licence headroom forecasts
Change enablementServiceMaximises successful changes by assessing risk, authorising and scheduling them.Change models, the change calendar and the CAB
Incident managementServiceRestores normal service as quickly as possible.Outages, degradation and loss of resilience
IT asset managementServicePlans and manages the full lifecycle of IT assets, to maximise value and control cost and risk.Hardware, software, licences, support contracts and disposal
Monitoring and event managementServiceObserves services and components, and records and reports changes of state.Polling, traps, logs, telemetry and event rules
Problem managementServiceReduces the likelihood and impact of incidents by finding causes and managing workarounds.Root causes, known errors and vendor bug cases
Release managementServiceMakes new and changed services and features available for use.Gold software releases and new service features
Service catalogue managementServiceProvides one consistent source of information about services and offerings.What users can request, and what each offering includes
Service configuration managementServiceKeeps accurate information about configuration items and how they relate.The CMDB, discovery and service maps
Service continuity managementServiceKeeps availability and performance acceptable in a disaster.Disaster recovery sites, tests and recovery plans
Service designServiceDesigns products and services that are fit for purpose and fit for use.Designs that include support, monitoring and suppliers
Service deskServiceCaptures demand for incident resolution and service requests, as the single point of contact.First line: logging, first fixes and routing
Service level managementServiceSets clear, business based targets and checks delivery against them.SLAs (service level agreements), OLAs (operational level agreements) and monthly service reviews
Service request managementServiceHandles agreed, user initiated requests in an effective and user friendly way.Access, VLAN changes, new starters and standard kit
Service validation and testingServiceMakes sure new or changed products and services meet their requirements.Lab tests, pilot sites and acceptance criteria
Deployment managementTechnicalMoves new or changed hardware, software and other components to live environments.Configuration pushes, software waves and staging
Infrastructure and platform managementTechnicalOversees the infrastructure and platforms the organisation uses.Networks, data centres, cloud platforms and their operations
Software development and managementTechnicalMakes sure applications meet internal and external needs.Automation code, templates and scripts as managed software

Practices, not processes

ITIL v3 had 26 processes and four functions. ITIL 4 replaced them with 34 practices. A practice includes its people, information, tools, suppliers and processes, so it is closer to a capability than to a flowchart.

Use the ones you need

Nobody runs all 34 at full depth. A network team leans on monitoring and event, incident, problem, change, configuration, release, deployment and supplier management. I start there.

One owner each

Each practice I put in place has a named owner who keeps its process, its data and its measures healthy. A practice with no owner decays within months.

Purposes summarised in my own words from the ITIL 4 practice guides. Incident, problem, change, service levels and patching are covered in depth on the support and service management page.

The service desk practice in action, with support lines, swarming and knowledge, is on my 1st, 2nd and 3rd line support page.

Events

Monitoring and event management, without the noise

ITIL 4 defines an event as any change of state that matters to the management of a service or a CI (configuration item). The practice is less about collecting data and more about deciding what each event means and who, if anyone, should act on it.

Events filtered into the right action Events from a core switch, a firewall and a WAN router flow into event management, which filters and correlates them. Informational events are only logged, warnings go to a watch list, and exceptions become incidents, routed to the network resolver group. Core switchtraps, telemetry Firewalllogs, health WAN routerpolls, IP SLA Event managementfilter, correlate Log onlyinformational Watch listwarning Incidentexception Resolvernetwork queue duplicates linked changes suppressed on call paged if P1 Event types from ITIL 4. Which events count as each type is a rule I agree with the service owner.

Swipe sideways to see the whole diagram.

Most events need no person. Many events arrive, and few should reach a person. Informational events are kept for trends and audit. Warnings show a threshold is near, so they feed capacity and problem work. Exceptions mean something is wrong, and become incidents with the CI (configuration item) already attached.

  • informational
  • warning
  • exception
Animation

Event rules I agree with service owners

EventTypeRuleResult
An access port goes up or downInformationalLog onlyKept for trends and audit
Link above 80% for 15 minutesWarningWatch list and a capacity recordNo incident. Reviewed weekly
One uplink of a redundant pair downExceptionIncident, priority 3Resilience lost, users unaware
Both uplinks to a site downExceptionIncident, priority 1, page on callSite down
The same interface flaps 5 times in 10 minutesExceptionOne incident, child events linkedOne ticket, not five
Any event from a device in its change windowAnySuppressed and logged against the changeExpected noise stays quiet
A clear event for an open incidentInformationalNote added; resolve only after checksNo silent auto close on a flapping link

Example rules and thresholds. Each organisation sets its own with the service owners.

Correlate with the CMDB

When a distribution switch fails, its access switches go quiet too. With relationships in the CMDB, the tool raises one incident for the cause and links the rest, instead of paging four people.

Change aware

The change calendar feeds the event tool. Alerts from a device inside an approved window are suppressed and logged against the change, so a planned reload never wakes the on call engineer.

Measure the noise

I track how many events become incidents, and how many alerts led to no action. If most pages need no action, the rules are wrong, not the engineers.

The sources themselves, SNMP (Simple Network Management Protocol) polling, traps, syslog, flows, telemetry and synthetic tests, are on the support and service management page.

Configuration

A CMDB people trust, because it is used every day

Service configuration management keeps accurate information about CIs and their relationships. The CMDB is where that lives. On every engagement I find one of two things: a CMDB nobody trusts, or none at all. The fix is the same. Record only what a process will use, and use it every day.

A service map in the CMDB Two business services, Payroll and the contact centre, depend on two application services, which run on five infrastructure CIs: app servers, the data centre fabric, a firewall pair, the internet edge and the branch WAN. A discovery tool scans the infrastructure. The steps show discovery, a mismatch, the impact of a firewall change and of a fabric fault, and the quality checks. depends on depends on runs on Payrollbusiness service Contact centrebusiness service HR applicationapplication service Teams callingapplication service App serverstwo VMs DC fabricleaf and spine Firewall pairactive, standby Internet edgetwo ISPs Branch WANSD-WAN Discoveryscans the estate record: 10.1, device: 11.1 owner · status · relationships · last seen CIs, linked by their relationships Discovery checks what is really there Reconcile: the record and the device disagree Impact: one firewall change, two business services Incident: the fault is on the fabric, the impact on Payroll Quality: complete, correct and current

Swipe sideways to see the whole diagram.

Step 1
  1. A CI (configuration item) is anything that must be managed to deliver a service. Each has a class, an owner, a status and relationships. Business services depend on application services, which run on infrastructure.

  2. A discovery tool scans the estate on a schedule: devices, software versions, serial numbers and connections. Discovery finds what exists. The CMDB (configuration management database) says what should exist and why.

  3. Here the record says the firewalls run release 10.1, but discovery finds 11.1. Either a change was not recorded or the record was never updated. Every mismatch is investigated, not overwritten blindly.

  4. Before a firewall change, the relationships show it touches the HR (human resources) application and Teams calling, so two business services. The change risk, the window and the people consulted all follow from that.

  5. When the data centre fabric fails, the incident is logged against that CI. The map shows Payroll is affected, so the service desk can tell the right people before they call.

  6. A CMDB is only useful if people trust it. I measure completeness against discovery, the share of CIs with an owner and a status, and how recently each was seen.

Asset or configuration item?

ThingIT asset?CI?Why
A live core switchYesYesIt has financial value and it delivers service
A spare switch on the shelfYesNot yetIt has value but delivers nothing until it is installed
A software licenceYesSometimesTracked for cost and compliance; a CI only if service depends on it
The Payroll serviceNoYesNo purchase value, but the most important thing on the map
A carrier circuitContractYesIts fix time and its relationships drive incident priority
A firewall rule baseNoPart of the firewall CIVersioned with the device, compared against the approved backup

IT asset management tracks value, cost and lifecycle. Service configuration management tracks what delivers service and how it fits together. The records overlap but the questions differ.

Record what you will use

I only add a CI class when a process needs it. For networks that means devices, pairs and stacks, circuits, sites, services and contracts. Interfaces and VLANs stay in the network tools unless a service depends on one.

Discovery feeds, people decide

Discovery and service mapping fill in what exists. People own what it is for: the service, the owner and the support group. A CMDB that is only discovery data cannot answer "who do I call?"

Changes update it

Every change that adds, moves or removes a CI updates the record in the same change. Monthly reconciliation catches what slipped through.

What an asset record holds, and disposal that can be proved, is on the end user computing page.

Release and DevOps

Release, deploy and change, at the speed of automation

ITIL 4 splits the old release and deployment process into separate practices, and renamed change management to change enablement. Together they let tested, repeatable work move fast and keep scrutiny for the changes that need it. That fits DevOps and SRE (site reliability engineering) far better than the old weekly CAB for everything.

Standard changes through a pipeline A template change is committed, tested automatically and passed to a risk check. Low risk, tested and repeatable changes take the fast path as standard changes straight to deployment. New or higher risk changes go to the change authority first, then to deployment. Committemplate edit Testslint, lab, policy Risk checkchange model Standard changepre approved Change authorityassess, approve Deployin a window tested, low risk, repeatable new or higher risk Change models from change enablement, applied to a deployment pipeline. Names and checks are examples.

Swipe sideways to see the whole diagram.

Change enablement, not change prevention. A change that has passed the same tests many times, with a known rollback, earns standard change status and flows straight to deployment. Anything new or riskier is routed to a change authority. The pipeline writes the change record itself, so the audit trail costs nothing.

  • standard change
  • normal change
Animation
PracticeThe question it answersA network example
Release managementIs the new or changed service ready for people to use?Cisco IOS XE 17.12 becomes the approved gold release for the campus
Service validation and testingDoes it meet its requirements?Lab tests against the standard configuration, then a pilot site
Change enablementIs it safe to change live service now?Each upgrade wave is a change, assessed and scheduled
Deployment managementHow does it get onto the live devices?Images staged, hash checked and activated in waves

ITIL 4 separates release from deployment: a release can be deployed in stages, and a deployment can sit unreleased behind a feature flag. Software versions here are examples.

ITIL alongside DevOps and SRE

Site reliability engineering ideaClosest ITIL practiceHow I combine them
SLOs (service level objectives) and SLIs (service level indicators)Service level managementInternal objectives sit tighter than the SLA, so I act before a breach
Error budgetsChange enablement, risk managementWhile the budget lasts, standard changes flow. When it is spent, risky change pauses
Blameless postmortemsProblem managementThe review feeds a problem record with owners and dates
Toil reductionContinual improvementRepeated manual work goes on the improvement register to automate
Infrastructure as codeDeployment, configuration managementThe repository is the source of truth; the CMDB links to it

Pipelines and source of truth tooling are on the network automation page.

Knowledge

Knowledge management, written while the fault is fresh

Knowledge management keeps information findable, trusted and current. For infrastructure that means runbooks, known errors, diagrams and design records. I use KCS (Knowledge-Centered Service) ideas with ITIL, because they make knowledge part of the daily work rather than a separate job nobody has time for.

The KCS Solve Loop around a knowledge base A loop of four practices around a central knowledge base: capture knowledge while solving, structure it with a simple template, reuse it by searching before solving, and improve it whenever it is used. Knowledge flows into the base from capture and out of it to reuse. Knowledge baseone place, searched first Capturewhile solving Structurea simple template Reusesearch before solving Improvefix it when used The Solve Loop of KCS, from the Consortium for Service Innovation.

Swipe sideways to see the whole diagram.

Knowledge as a by product of solving. The engineer searches first, uses an article if one exists, improves it if it is wrong, and captures a new one if not. Knowledge is written while the fault is fresh, not weeks later, and it gets better every time it is used.

Animation

An article that works at 3am

Part of the articleWhat goes in itExample
IssueThe symptom in the words the user or the alert used"Phones at the Leeds branch keep rebooting"
EnvironmentWhere it applies: platform, release, site typeCatalyst 9300 access switches, PoE phones
ResolutionThe steps that fix it, and how to confirmCheck the PoE budget, move phones, raise a capacity change
CauseWhy it happens, once knownThe power budget was exceeded after cameras were added

The article structure used in KCS. The example is mine.

Shift left

Every article that lets first line fix a fault, or lets a user fix it themselves, moves work to where it is cheapest and fastest. Third line time then goes on problems and design.

Measure reuse

I track how often articles are linked to resolved tickets, the share of fixes at first contact, and articles flagged as wrong. Unused articles are archived.

Owners and dates

Every runbook and article has an owner and a review date. Network articles are checked after every software release, because commands and outputs change.

Improvement

Continual improvement, with a baseline and a date

Continual improvement is both a practice and part of the value system. ITIL gives a seven step model for it. I use the model for anything from a single queue to a whole support organisation. Step through it with a real kind of problem: repeat outages at branch sites.

The continual improvement model The seven steps of the ITIL continual improvement model, arranged in a loop. They are: what is the vision, where are we now, where do we want to be, how do we get there, take action, did we get there, and how do we keep the momentum going. An example of reducing repeat branch outages runs through each step. 1 Visionwhat is the vision? 2 Where nowmeasure today 3 Where to beset a target 4 Howplan the work 5 Actdo it, step by step 6 Got there?check the measures 7 Momentumkeep it going Example: repeat branch outages What is the vision? Where are we now? Where do we want to be? How do we get there? Take action Did we get there? How do we keep the momentum going?

Swipe sideways to see the whole diagram.

Step 1
  1. Agree the goal in business terms with the service owner: branch staff should not lose their tills because of the network. That ties the work to value, not to a tool.

  2. Measure the baseline: 14 branch outages last quarter, 9 of them repeats, with an average of 3 hours to restore. Without a baseline nobody can prove the change worked.

  3. Set a measurable target with a date: half the repeat outages within two quarters, and every site with a tested backup path. Targets come from the gap, not from a template.

  4. Plan the work in small steps: fix the top three causes first, add a backup circuit at the worst sites, and write the knowledge articles. Each step has an owner.

  5. Do the work through the normal practices: problem records, changes and releases. Iterate with feedback, checking each step does what it should before starting the next.

  6. Compare against the baseline: repeat outages fell from 9 to 3. If the target was missed, learn why before adding more work.

  7. Share the result with the people who did the work and the people who benefit, put the next target on the register, and keep the measures in the monthly service review.

The improvement register

IdeaBenefitOwnerEffortStatus
Backup path at the 10 branches with most outagesFewer priority 1 incidentsNetwork leadMediumApproved
Auto create incidents from exception events onlyLess noise for the NOC (network operations centre)Monitoring ownerLowIn progress
Standard change model for access port VLAN changesRequests done in hours, not daysChange managerLowDone
Article for every top 10 fault categoryMore first contact fixesService desk leadLowIn progress
Retire the second monitoring toolOne view, lower costTools ownerHighProposed

An example improvement register. Each idea has a benefit, an owner, an effort estimate and a status, and the register is reviewed every month.

Measures, and how they mislead

MeasureWhat it tells meWatch out for
First contact resolutionHow much first line can fixClosing tickets early to hit the number
MTTR (mean time to restore)How fast service comes backAn average hides the long tail; I look at the 90th percentile too
Reassignments per ticketWhether routing worksTeams bouncing tickets to stop their own clock
Change success rateChanges with no incident or back outFailed changes recorded as successful with a follow up change
Repeat incidentsWhether problem management worksRepeats logged under new categories
User satisfactionWhat people actually feelSurveys only sent on tickets that went well

Measures I report monthly. Targets vary by organisation, so none are given here.

SLAs and XLAs

An SLA measures what IT delivers. An XLA (experience level agreement) measures what users experience, such as how long a new starter waits to be productive. I use both, because each catches what the other misses.

The watermelon effect

Green on the outside, red inside: every SLA met while users are unhappy. It happens when the measures count tickets, not outcomes. Satisfaction, reopens and repeat faults expose it.

Measures drive behaviour

People optimise for what they are measured on. I pick few measures, explain why each matters, and review them together so nobody games one at the expense of another.

Try it: a quick maturity check

Six questions I ask at the start of an engagement. Choose the answer closest to your team. This is an indicative starting point, not the ITIL maturity assessment, which scores each practice on capability levels from 1 to 5.

Indicative score: 12 out of 18, defined but not yet measured. The basics exist. The next gain usually comes from measuring outcomes and giving each practice an owner who acts on them.

Tooling

ITIL in the tools, without bending the tool

ITIL is tool neutral, but most organisations meet it through an ITSM (IT service management) platform. These are the platforms I meet most, with where each practice lives. Module names change between releases, so I check them against the current version on each engagement.

ServiceNow

PracticeWhere it lives
Incident, problem and changeIncident Management, Problem Management, Change Management, with change models and conflict checks
Service requests and the catalogueService Catalog and Request Management, with fulfilment workflows
Service configuration managementThe CMDB, filled by Discovery and Service Mapping
Monitoring and event managementEvent Management, part of IT operations management, which turns alerts into incidents
IT asset managementHardware Asset Management and Software Asset Management
Service level managementSLA definitions with response and resolution timers
Knowledge managementKnowledge bases with article review and feedback
Measurement and continual improvementPerformance Analytics and Continual Improvement Management

ServiceNow is in my core skills. I design the routing, the CI classes and the change models first, then configure the platform to match.

Rules I follow when configuring a tool

  1. Process before product. I map the value streams and agree the routing and CI classes before anyone configures a form. A tool cannot fix a process nobody agreed.
  2. Fewer fields, better data. Every mandatory field must be used by a report or a rule. Otherwise analysts fill it with whatever is first in the list.
  3. One record of each thing. One CMDB, one change calendar and one knowledge base, even when several teams and suppliers use them.
  4. Integrate the monitoring. Events create and update incidents automatically, with the CI attached, so nobody retypes an alert.
  5. Stay close to the platform. Heavy customisation makes every upgrade a project. I configure first and customise only for a clear business reason.
Versions

From v3 to ITIL 4 and on to Version 5

Most organisations I work with still run processes set up under ITIL v3, with ITIL 4 language arriving through training and tools. Knowing how the versions map onto each other avoids long arguments about names, and lets a team keep what works.

ITIL from version 1 to Version 5 A timeline of ITIL. Version 1 came in the late 1980s from the CCTA, version 2 from 2000 from the OGC, then version 3 in 2007 and the 2011 edition. ITIL 4 followed in 2019 from AXELOS and Version 5 in 2026 from PeopleCert. Each step highlights one version and what it changed. ITIL v1late 1980s ITIL v22000 to 2004 ITIL v32007 ITIL 2011revised v3 ITIL 42019 Version 52026 Government guidance for IT operations Service support and service delivery A lifecycle of five stages Clearer, more consistent v3 A value system and 34 practices Lifecycle and AI guidance, same practices CCTA OGC OGC Cabinet Office AXELOS PeopleCert Dates are first publication. Version 5 began with Foundation in February 2026.

Swipe sideways to see the whole diagram.

Step 1
  1. The UK government's CCTA (Central Computer and Telecommunications Agency) published the first ITIL books, as practical guidance for running government IT. The library grew to dozens of volumes.

  2. Published from 2000, as the CCTA became part of the OGC (Office of Government Commerce). Service support and service delivery became the core books, with the service desk and incident, problem, change and configuration management at their heart.

  3. In 2007 ITIL v3 organised everything as a service lifecycle of five stages: strategy, design, transition, operation and continual service improvement, with 26 processes and four functions.

  4. A 2011 update made v3 clearer and more consistent without changing its shape. Much of the ITIL still running in organisations today was set up to this edition.

  5. Launched in February 2019 by AXELOS, then a joint venture of the UK Cabinet Office and Capita. It replaced the lifecycle with the service value system and the processes with 34 practices. PeopleCert bought AXELOS in 2021.

  6. PeopleCert began releasing ITIL Version 5 in 2026, starting with Foundation in February. It keeps the principles, the four dimensions, the value system and the 34 practices, and adds a product and service lifecycle and guidance on AI (artificial intelligence).

From the v3 lifecycle to the ITIL 4 value chain The five ITIL v3 lifecycle stages on the left and the six ITIL 4 value chain activities on the right. Choosing a stage draws lines to the activities that took over its work. ITIL v3 lifecycle ITIL 4 value chain Service Strategyportfolio, demand, finance Service Designcatalogue, levels, capacity Service Transitionchange, release, configuration Service Operationincident, problem, desk Continual Service Improvementthe seven step process Plan Improve Engage Design and transition Obtain or build Deliver and support A rough mapping to help teams move across. ITIL 4 does not map them one to one.

Swipe sideways to see the whole diagram.

Service Strategy becomes mostly plan, with demand and business relationships in engage. Portfolio, financial and strategy management carry on as practices.

Service Design becomes design and transition, with some of its work in plan. Service level, capacity, availability and continuity management carry on as practices.

Service Transition splits between design and transition and obtain or build. Its release and deployment process became two separate practices.

Service Operation becomes deliver and support, while the service desk sits mostly in engage. The four v3 functions became parts of practices rather than teams.

Continual Service Improvement becomes the improve activity, and continual improvement also appears as a practice and as a part of the whole value system.

Animation

What carries over

The guiding principles, the four dimensions, the service value system and the 34 practices all carry into Version 5, with minor changes to terms. Teams running ITIL 4 well are most of the way there.

What is new

A digital product and service lifecycle with eight activities: discover, design, acquire, build, transition, operate, deliver and support. Guidance on AI runs through the whole framework.

What I do about it

I keep ITIL 4 as the working baseline on current engagements, read the new lifecycle against the product teams I work with, and adopt Version 5 terms when the organisation's tools and training move.

Certification paths

LevelITIL 4ITIL Version 5
EntryITIL 4 FoundationITIL Foundation (Version 5), the single entry point
PractitionerPractice Manager, built from practice modulesRole based modules, with a Practice Manager path
ProfessionalManaging Professional: four modules on creating, delivering and supporting services, stakeholder value, high velocity IT, and direction and improvementManaging Professional, with a transition course for ITIL 4 holders
LeaderStrategic LeaderStrategic Leader
ExpertITIL MasterITIL Master

The Version 5 scheme was still being released through 2026, so I check PeopleCert's current list before planning training. ITIL 4 Foundation remains valid as the prerequisite for Version 5 modules.

When it goes wrong

When ITIL goes wrong, find the stage that fails

Service management faults show up as unhappy users and tired engineers, not as alarms. I trace them the way I trace a network fault: follow one ticket through each stage until I find where it fails. Choose a symptom to see where it usually sits and what I check. My general fault finding method is on the troubleshooting page.

A service management fault finder Six stages a ticket passes through: detect, log, route, resolve, change and measure. For each symptom, a ticket travels as far as the stage that fails, and a panel shows an example of what I see and what I check. Detectmonitoring Logservice desk Routeassignment Resolvefix and learn Changechange, release Measurereports, CMDB Symptom: Alert storms bury real faults Symptom: First line escalates almost everything Symptom: Tickets bounce between teams Symptom: Simple requests take days Symptom: The same fault keeps coming back Symptom: Changes wait weeks for approval Symptom: Nobody trusts the CMDB Symptom: Every SLA met, users still unhappy What I see What I check Example: 400 alerts a day, 3 real incidents, pages ignoredAlerts per CI per week, and the share closed with no action Example: 35% fixed at first contact, the rest sent to second lineTop 20 categories by volume, and articles linked to resolved tickets Example: 1 ticket in 5 reassigned 3 times or moreReassignments by category, service and resolver group Example: access requests wait 3 days, mostly for approvalRequests by catalogue item, and time spent waiting for approval Example: the same 10 CIs top the incident list every monthIncidents per CI, and the problem records linked to them Example: 15 day lead time, 90% approved without commentChanges by model and risk, approval time, failed changes by type Example: discovery finds 18% of devices missing from the CMDBReconciliation report, CIs with no owner, CIs not seen in 30 days Example: 98% of SLAs met, satisfaction 2.9 out of 5Satisfaction comments by service, reopen rate, repeat contacts

Swipe sideways to see the whole diagram.

Alert storms bury real faults. Every change of state raises an alert, so the people on call stop reading them. I classify events with the service owner, correlate through the CMDB, suppress alerts during approved changes, and remove any alert that never leads to action.

First line escalates almost everything. First line has no articles or access for the common faults, or the categories are too vague to act on. I take the top categories, write articles, give first line safe checks and tools, then measure first contact fixes each month.

Tickets bounce between teams. Tickets route on vague categories, or the CI in the CMDB has no support group. I route on the affected service and CI, fix the categories with the teams that receive them, and agree that a group keeps a ticket until another accepts it.

Simple requests take days. Routine requests are logged as incidents, or wait for approvals that add nothing. I add catalogue items with pre approval for low risk requests, automate fulfilment where I can, and measure time spent waiting as well as time spent working.

The same fault keeps coming back. Incidents are closed with a workaround and nobody raises a problem record. I set a trigger, such as three incidents on one CI in a month, review the top repeat CIs weekly, and give each problem an owner and a date.

Changes wait weeks for approval. Every change goes to one board whatever its risk, so the board approves them without real review. I add standard change models for repeatable low risk work, delegate approval by risk, and keep the board for changes that need debate.

Nobody trusts the CMDB. It was loaded once and never kept up. I cut it to the CI classes a process uses, feed it from discovery, make every change update it, and report completeness each month until teams rely on it.

Every SLA met, users still unhappy. This is the watermelon effect: the SLAs measure ticket handling, not outcomes. I read the comments, add measures users feel, such as time to be productive, and review them with the business each month.

Animation

Health checks I run every month

Monthly checkHealthy looks likeIf not
Incidents with a CI attachedNearly all, so trends per CI mean somethingMake the CI mandatory at resolution, filled from the event
Problems opened from repeat incidentsEvery top repeat CI has a problem recordReview the top repeats weekly
Standard changes as a share of all changesRising as models are addedLook for repeatable work still going to the board
Articles used to resolve ticketsRising, with few flagged as wrongFix or archive the flagged articles first
Improvement register items closedSome every month, each with a measured benefitFewer, smaller items with named owners

Indicative checks. The right level for each depends on the organisation and its baseline.

Engagement

How I bring ITIL into an infrastructure service, from first workshop to steady state

ITIL work usually starts with a complaint: tickets bounce, changes wait, nobody trusts the CMDB, or a new service is about to go live with no support model. I follow the same path each time: agree what matters, find out how work really flows, design the practices and their owners, prove them with a pilot, then keep them improving.

How an engagement runs, from first conversation to lifecycle Seven stages from left to right: engage (stakeholders), requirements (FR and NFR), discovery (current state), design (practices), build and test (build, pilot), support (go live), lifecycle (keep current). For each stage the panel shows who I work with and what comes out of it. After the lifecycle stage the loop returns to the start. Engagestakeholders RequirementsFR and NFR Discoverycurrent state Designpractices Buildbuild, pilot Supportgo live Lifecyclekeep current Step 1 · EngageAgree which services matter, and to whomWho I work withWhat comes outService ownersService desk leadNetwork and platform leadsServices and practices in scopePain points and goalsPractice owners namedDecision log and RACI Step 2 · RequirementsOutcomes, targets and what to recordWho I work withWhat comes outService ownersSecurity and auditSuppliers and financeService catalogue entriesSLA, OLA and contract targetsData the CMDB must holdReporting needs Step 3 · DiscoveryHow work really flows todayWho I work withWhat comes outService desk analystsResolver groupsTool administratorsA year of ticket data analysedValue stream mapsCMDB accuracy samplePractice capability scores Step 4 · DesignValue streams, owners and routingWho I work withWhat comes outDesign authorityPractice ownersTool ownerValue streams and practicesAssignment groups and routingCI classes and relationshipsChange models and standard changes Step 5 · Build and testConfigure, test with real tickets, pilotWho I work withWhat comes outPlatform engineersPilot resolver groupChange authorityConfigured workflowsPilot results and fixesTraining and knowledgeCutover and rollback plan Step 6 · SupportMeasures, owners and a review rhythmWho I work withWhat comes outService desk and NOCPractice ownersService ownersDashboards per practiceMonthly service reviewsImprovement registerHypercare exit criteria Step 7 · LifecycleImprove, retire and adopt new guidanceWho I work withWhat comes outPractice ownersDesign authorityTool vendorQuarterly practice reviewsTool upgrades testedUnused steps and fields retiredVersion 5 adoption plan

Swipe sideways to see the whole diagram.

Step 1
  1. I start with the services that matter most and the people who own them, not with the tool. I agree what good looks like for users, which teams and suppliers are in scope, and who decides. A RACI (responsible, accountable, consulted, informed) chart names each practice owner.

  2. I turn the goals into requirements for each practice and service: what must happen, how fast, and what must be recorded. Service levels must add up from suppliers to users. Security and audit needs, such as change records for regulated systems, are written in now.

  3. Before designing anything I study how work really flows. I export a year of tickets and look at categories, reassignments, repeat CIs and time spent waiting. I sit with the service desk, sample the CMDB against discovery, and score each practice against its purpose.

  4. The design sets the value streams, the practices and their owners, the routing and assignment groups, the CI classes and relationships, and the change models. Every decision traces back to a goal agreed at the start. Tool configuration follows the design, not the other way round.

  5. The tool is configured to the design and tested with real tickets from the discovery data. A pilot with one resolver group proves the routing and the measures. Training, knowledge articles and a cutover plan with a rollback are ready before the wider launch.

  6. After go live, each practice owner has a dashboard and a monthly review. Hypercare, the period of extra support after go live, ends only when agreed measures hold for a set period. Service and supplier reviews use the same numbers, so nobody argues about whose data is right.

  7. Practices need upkeep like any system. I review each one quarterly against its measures and remove steps and fields nobody uses. I test tool upgrades before they reach production, and plan when to adopt new guidance such as ITIL Version 5 and its product and service lifecycle.

Functional requirements

What it must do.

  • Log every incident, request and change against a service and, where known, a CI.
  • Route work to the right resolver group on the first assignment, using the service and the CI.
  • Create incidents automatically from exception events, with the CI attached.
  • Offer approval routes that match the risk of each change, with standard changes pre approved.
  • Report each practice's measures to its owner, and each service's levels to its owner.
  • Keep knowledge articles where first line and users can find them.

Non functional requirements

How well it must do it, with a number wherever one can be agreed.

Response
Priority 1 incidents acknowledged within 15 minutes, at any hour the service runs (typical).
Routing
Most tickets resolved with no more than one reassignment (typical aim).
Change
Standard changes approved at once, normal changes assessed within days rather than weeks (typical).
CMDB accuracy
Over 95% of discovered devices matched to a CI with an owner and a status (typical aim).
Event noise
Most pages lead to action, and alerts that never do are reviewed monthly.
Audit
Every change to a regulated system traceable to an approved record.
Resilience
A fallback way to log and track incidents when the ITSM platform itself is down.
Data protection
Personal data in tickets kept to what is needed, under UK GDPR (the General Data Protection Regulation).

Figures are typical starting points. Each organisation agrees its own from its baseline.

Projects

Where I have used it

I design for operation from the first workshop, so service management runs through every role on my CV. These are the roles where change governance, support and operational handover were a large part of the work.

BNY Mellon · 2018 to 2019

Change governance through a regulated refresh

Delivered the EMEA (Europe, the Middle East and Africa) Network Refresh with a blended team of 5 engineers and 4 vendors, advising on change governance and architecture standards. The estate stayed compliant with MiFID II (the Markets in Financial Instruments Directive) throughout, with no service outages.

Penguin Random House · 2013 to 2015

Support and operations after a merger

Post merger infrastructure integration across a multi site estate, including distribution centres. Rationalising infrastructure, support and technology overheads saved £700k a month across support and operations.

AVEVA · 2020 to 2021

Standards every regional team adopted

Set the design authority standards adopted by every regional delivery team. Over £200M of transactional services were safeguarded through data centre transitions at 99.99% uptime, and every global site was upgraded remotely during the lockdowns with no delay.

XIDA · 2021 to 2024

From discovery to operational handover

Lead architect on network, cloud and data centre modernisation programmes from discovery to operational handover across several client environments. Planned and ran remote site migrations across regulated environments with no critical incidents.

Manx Telecom · 2016

Managed infrastructure for 300 sites

Tier 3 data centre and managed infrastructure for over 300 customer sites on Cisco ACI (Application Centric Infrastructure) and Nexus.

iSystems Integration · 2019

Architecture alongside business as usual

Directed architecture and delivery across AWS (Amazon Web Services), Google Cloud, Azure, disaster recovery, Catalyst SD-WAN, SD-Access and security, and led and mentored a team of 4 engineers alongside BAU (business as usual) work.

Backed by ITIL v3 and ITIL 4, with PRINCE2 Practitioner for the projects that change services, and ServiceNow in my core skills. See all credentials